  • 安装落水系统水落管要怎么做?
  • 本站编辑:杭州曼布斯建材有限公司发布日期:2018-07-26 17:39 浏览次数:

6.5型金属落水系统

落水系统水落管安装:安装水落管随外檐抹灰架子由上往下进行,先在水落口处吊线坠弹出直线,用钢錾子在墙上打眼,按直线用水泥砂浆埋入卡子铁脚,卡子间距1.2m一个,卡子露出墙面2cm左右,待水泥砂浆达到强度后再安装水落管;有马腿弯时上口必须压进水斗嘴内5~6cm,并在弯管与直管接槎处加钉一个卡子。安装下节水落管时套入上节水落管的长度应不少于4cm,加一半圆卡子用螺丝拧紧;最下面一节管子要待勒脚、散水做完后才能安装,主管距散水面20cm处安装45度弯嘴一个,弯嘴与水落管之间接头必须焊接;水落管经过带形线脚、檐口等墙面突出部位处宜用直管,线脚、檐口等处应预留缺口或孔洞;如必须采用弯管绕过时,弯管的弯折角应为钝角。
Installation of the water pipe: the installation of the water pipe with the outer eaves plastering rack from the top down, first in the drop mouth hanger line fall out straight, with steel chisel on the wall eye, in line with the cement mortar into the card iron foot, 1.2m one distance between the card, the card exposes the wall of about 2cm, after the mud mortar to reach strength, then install the water pipe; When a horse has a leg bent, it must be pressed into the mouth for 5 to 6cm, and a clip is added to the joint between the elbow and the straight pipe. The length of the installation of the lower water pipe should not be less than 4cm, and a half circle clip is screwed with screws; the bottom pipe is to be installed after the foot and water is finished. The head is installed at the 45 degree bend of the water surface at 20cm, and the joint between the bend and the water pipe must be welded; the water pipe passes through the shape and foot. It is appropriate to use a straight pipe in the outburst of the eaves and other wall surfaces, and the notch or hole should be reserved for the line feet and eaves. If the elbow must be taken around, the bending angle of the elbow should be a passive angle.
Installation of the water pipe: the installation of the water pipe with the outer eaves plastering rack from the top down, first in the drop mouth hanger line fall out straight, with steel chisel on the wall eye, in line with the cement mortar into the card iron foot, 1.2m one distance between the card, the card exposes the wall of about 2cm, after the mud mortar to reach strength, then install the water pipe; When a horse has a leg bent, it must be pressed into the mouth for 5 to 6cm, and a clip is added to the joint between the elbow and the straight pipe. The length of the installation of the lower water pipe should not be less than 4cm, and a half circle clip is screwed with screws; the bottom pipe is to be installed after the foot and water is finished. The head is installed at the 45 degree bend of the water surface at 20cm, and the joint between the bend and the water pipe must be welded; the water pipe passes through the shape and foot. It is appropriate to use a straight pipe in the outburst of the eaves and other wall surfaces, and the notch or hole should be reserved for the line feet and eaves. If the elbow must be taken around, the bending angle of the elbow should be a passive angle.
Installation of the water pipe: the installation of the water pipe with. Card, the card exposes the wall of about 2cm, after the mud. The lower water pipe should not be less than 4cm, and and a. Be welded, the water pipe passes through the shape and foot. It. Be a passive angle.

友情链接:88彩票|官网  88彩票-官网  环球彩票官网  幸运彩票-Welcome  88彩票|官网  环球彩票  88彩票|官网  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!